I started this blog when I was restoring a 1917 Kennebec canoe. Now I have added to my boat building adventures, and built a kayak. I also have pages about birds and astronomy.
Thursday, May 24, 2018
Keel lashing and preparing floor runners and boards
The keel lashing is done through a hole drilled in the keel at each rib.
Floor boards and floor runner pieces were cut and sanded.
No comments:
Post a Comment